Friday....
- Rick T.
- Jul 9, 2021
- 1 min read
Well...I have been pore filling my butt off. The back is 100. The sides is 97% done. The peghead is 95%. After that I just have the neck.
I am starting work again at the college. Daily 9-1. I think we will be back to full time by sept 16th. This will give me less time for building and slow things down a bit.
Today the hyvibe preamps came in. I will be putting them into my next builds. Here is a test of the exciters on a guitar. I am sending the music to the preamp via bluetooth. This preamp has a rechargeable battery that is supposed to have 10hrs usage per charge:
Comments